Turn Your Roof Into A Zero-Bill Powerhouse
Certified rooftop solar installation, shadow-free site feasibility surveys, net metering DISCOM paperwork, and high-efficiency On-Grid & Hybrid PV arrays.
Govt Subsidy Support
Net Metering Setup
150 km/h Wind Rated
Chemical Earthing
Solar Savings Estimator
Based on your monthly power consumption
Authorized Engineering & Mounting for India's Top Tier-1 Solar Manufacturers
Solar Installation & Feasibility Packages
Certified technicians equipped with safety harnesses, torque wrenches, and calibrated solar multimeters.
Shadow-Free Rooftop Solar Feasibility & Engineering Survey
4.9 (1.5k+ Setups)
What's Included:
- Sun-path 3D shadow analysis for 365-day unobstructed PV yield
- Roof structure concrete strength & angle azimuth orientation
- DISCOM sanctioned load & bi-directional net meter eligibility check
- PV array capacity sizing (1 kW to 100 kW+)
- Complete engineering ROI & payback period report
3 kW Rooftop On-Grid Solar System Installation
4.9 (1.5k+ Setups)
What's Included:
- TopCon / Mono-PERC 550W+ Tier-1 high-efficiency solar modules
- Grid-tied string inverter with real-time Wi-Fi generation tracking
- Hot-dip galvanized (HDG) elevated wind-resistant mounting structure
- ACDB & DCDB boxes with Type-2 surge protection devices (SPD)
- DISCOM bi-directional net meter paperwork & commissioning
5 kW Rooftop On-Grid Solar System Installation
4.9 (1.5k+ Setups)
What's Included:
- Bifacial / Mono PERC 550W+ Tier-1 solar modules with 25-year warranty
- Dual-MPPT high efficiency inverter with cloud monitoring app
- Elevated heavy-duty aluminum / HDG structural mounting
- Dedicated chemical copper earthing pits + lightning arrestor
- PM Surya Ghar Muft Bijli Yojana subsidy paperwork assistance
Why Professional Solar Engineering Matters
A solar plant is a 25-year investment. Quality mounting and surge earthing protect your home.
Shadow-Free Azimuth Alignment
Even a tiny 5% shadow over one solar cell drops string generation by up to 50%. We pinpoint the ideal South-facing tilt angle for maximum units per year.
Zero Roof Leak Waterproofing
We use non-penetrating counterweight footings or UV-resistant chemical mastic anchor seals, guaranteeing zero water seepage during heavy monsoons.
DISCOM Net Metering Liaison
We handle single-line engineering diagrams (SLD), test certificates, and portal filing to expedite bi-directional meter sanction without delays.
Transparent Solar Installation Rate Card
Honest labor and engineering rates. All hardware specs adhere to MNRE & IEC standards.
| Solar Service | Timeline | Warranty | Labor Rate |
|---|---|---|---|
| Rooftop Solar Feasibility & Engineering Site Survey | 60 mins | Report Guaranteed | ₹499 |
| On-Grid System Installation Labor (up to 3 kW) | 1 - 2 Days | 1 Year | ₹11,999 |
| On-Grid System Installation Labor (4 kW - 5 kW) | 2 Days | 1 Year | ₹18,499 |
| On-Grid System Installation Labor (6 kW - 10 kW) | 2 - 3 Days | 1 Year | ₹32,999 |
| Hybrid Solar Inverter & Battery Bank Setup | 1 Day | 1 Year | ₹6,499 |
| Chemical Earthing Pit with Copper Bonded Electrode | 3 - 4 Hours | 2 Years | ₹3,499 |
| ESE Lightning Arrestor with Dedicated Down Conductor | 2 - 3 Hours | 1 Year | ₹4,999 |
| Net Metering File Prep & DISCOM Verification Assist | Liaison | Full Support | ₹2,499 |
| Panel Deep Cleaning & Annual Electrical Audit (up to 5kW) | 90 mins | 30 Days | ₹1,499 |